A new UK Government consultation on its Net Zero / energy infrastructure plans, Including discussion of EMFs. Comments need to be in by 29th May 2025.
Have your say on the ‘Great Grid Upgrade’ plans, including pylons, undergrounding power-lines, and subsea electricity distribution options.
There are two links below; one to the consultation page, and the other to the background documentation (which is massive).
Consultation link:
Consultation documentation: